Engineering Readiness
Engineering deliverable status. Production is blocked or flagged when required drawings, BOM or customer approval are not released-for-production.
6 rows
| D001 | GA Drawing | C | B | Yes | Complete | — |
| D001-M02 | SLD | B | B | Yes | Complete | — |
| D001-M02-PR03 | Wiring Diagram | A | B | No | Missing | Awaiting customer sign-off on relay config |
| D002 | Mechanical Drawing | B | A | Yes | Complete | — |
| D002-M02 | Method Statement | — | — | N/A | Missing | Not yet issued by engineering |
| D003 | BOM | A | A | No | Missing | Revision pending after design review |
Page 1 of 1